Acceptance Testing Proves the Gear Works. Commissioning Proves the Design Does.

Two phases, two NETA standards, and two different reasons a commercial electrical crew is still on site after the switchgear is energized.

Author:
AmpScouts Editorial
Published:
10/02/2026
Updated:
10/02/2026
Reading time:
2 min read
Preparing narration…

On a large commercial or industrial job, the switchgear is set, the feeders are pulled, the gear is energized, and the work still is not finished. Two more phases have to happen, and they have different names: acceptance testing and commissioning. Electricians new to big projects hear the two words used interchangeably, often in the same sentence by the same superintendent. They are not the same thing. They answer different questions, they produce different paperwork, and they are governed by two separate standards.

Acceptance testing is the set of field tests and inspections that establish whether a piece of electrical equipment is fit to be energized and formally accepted. The governing document is ANSI/NETA ATS, the acceptance testing specification published by the InterNational Electrical Testing Association; the current edition is ATS-2025. Commissioning is the broader documented process of placing a newly installed or retrofitted system into service, and its standard is ANSI/NETA ECS, now in a 2024 third edition. The cleanest way to hold the difference is this: acceptance testing proves the equipment is within applicable standards and the manufacturer's tolerances, while commissioning verifies that the installed system meets what the owner asked for and what the engineer drew, which the standard calls the owner's project requirements and the basis of design.

In practice that splits the work by scope. ATS-2025 covers the equipment level, with sections for switchgear, transformers, cables, and circuit breakers, plus power system studies, system function tests, thermographic surveys, partial discharge studies, and, new in this edition, battery energy storage and solar photovoltaic systems. ECS-2024 sits above that and is organized by voltage class: low voltage under 1,000 volts, medium voltage from 1,000 to 100,000 volts, and high and extra-high voltage from 100,000 volts up to 1,000,000 volts. The 2024 edition added sections for photovoltaic systems, uninterruptible power supplies, and automatic transfer switches, which are the three systems a critical facility depends on when utility power drops.

Both phases are staffed field work, and they are staffed differently. Acceptance testing is generally performed by an independent testing organization rather than the installing contractor, and ATS-2025 sets requirements for that organization and for the credentials of the people doing the testing; NETA also maintains a separate standard addressing the certification of electrical testing technicians. That is a defined lane for an experienced commercial electrician who wants out of raceway and into instruments. Commissioning works the other way. It pulls the installing contractor's own crew back onto a job that looked complete, because somebody has to rack breakers, throw transfers, and sign the sequence sheets.

The misconception worth correcting is that commissioning is paperwork filed after the real work ends. It is a functional test of the system as actually built, which is why it keeps finding what equipment-level testing cannot: a transfer switch landed on the wrong source, a relay setting that disagrees with the coordination study, a panel schedule that does not match the one-line. Each of those gets found with a crew standing there, and fixed on their hours.

If testing or commissioning sounds like where you want to end up, treat it as a destination rather than a starting point, since both assume you already read a one-line and understand protection. For how that progression is laid out, see the AmpScouts Electrician Career Paths page.